Design Focused Remediation of a UK Defence Manufacturing Site


Voluntary treatment of chlorinated solvents

Summary

  • Remediation of the chlorinated ethenes impacted groundwater through the combined use of 3-D Microemulsion® (3DMe) and HRC Primer®
  • Challenging fine sand aquifer with high groundwater pressure
  • Treatment tailored to target high concentration source and wider plume area
  • REGENESIS Remediation Services (RRS) carried out full design and application service at a fixed cost

icon-pdf Design Focused Remediation of a UK Defence Manufacturing SiteDownload the pdf

21_OIC26322_CVOC_3DMe_HRC_site Design Focused Remediation of a UK Defence Manufacturing Site

Remedial Treatment

The combined approach of 3DMe and HRC Primer utilises the best features of Regenesis’ suite of technologies for enhanced reductive dechlorination. HRC Primer penetrates the formation quickly and with its short hydrogen release profile rapidly exhausts competing electron acceptors and promotes strong anaerobic groundwater conditions. 3DMe, with its three stage electron donor profile, provides a controlled release of hydrogen for up to 5 years. In addition, the self-distributing nature of 3DMe is perfectly suited to a permeable formation to allow wider injection spacing and corresponding lower injection costs.

What’s Special?

  • Delineation of the source and wider plume allowed focussed contaminant treatment
  • The injection works, completed by REGENESIS between the demolition and construction phases, minimised impact on the site redevelopment programme