Enhanced Physical Extraction at Operational Petrol Filling Station in Italy


In-situ enhanced desorption of petroleum hydrocarbons with PetroCleanze

Summary

After extensive operation, Pump and Treat (P&T) at an hydrocarbon contaminated active petrol filling station, ceased recovering sufficient volumes of LNAPL. Therefore, an alternative was required to improve the recovery of LNAPL on site.

icon-pdf Enhanced Physical Extraction at Operational Petrol Filling Station in ItalyDownload the pdf

53_AIL42633_Site Enhanced Physical Extraction at Operational Petrol Filling Station in Italy

Treatment

REGENESIS’ PetroCleanze® was injected across two extraction locations. Following application, PetroCleanze was left for a period of 7 to 15 days to actively desorb the LNAPL into the groundwater after which it was easily recovered using a vacuum extraction truck.

What’s Special?

Desorption of TPH was observed two hours after application (see image) and product was successfully recovered during the two vacuum extraction events – dramatically improving the recovery rate of previously observed on site and achieving removal of free product.