Remediation of Operational Petrol Station in Veneto, Italy


Enhanced aerobic bioremediation treats hydrocarbon contamination

Summary

Leakages from underground storage tanks (UST) at an active petrol fuelling station resulted in significant hydrocarbon contamination impacting the soil and groundwater. The entire tank farm was replaced in 2007 and grossly contaminated soil excavated.

Yet, significant dissolved phase contamination remained present within the confined aquifer beneath the building and was migrating offsite. Further remediation and solution to contain the migrating contamination was required.

icon-pdf Remediation of Operational Petrol Station in Veneto, ItalyDownload the pdf

38_tank-farm Remediation of Operational Petrol Station in Veneto, Italy

Treatment

A barrier of ORC-Advanced® and ORC-Primer® was injected into the full depth of the aquifer (from 8.5 m to 3.5 m BGL) at the site boundaries and immediately downgradient of the former tank farm. Application was via Direct-Push and the injections were carried out in a double barrier configuration downgradient of the former contaminant source and at site boundaries, ensuring that migrating contamination is effectively treated..

What’s Special?

ORC-Advanced has been specifically designed to provide a controlled release source of dissolved oxygen, driving enhanced aerobic bioremediation for up to 12 months.

ORC-Advanced is effective in barrier applications where there is a continual influx of contaminant requiring treatment.

38_PS_Reg_1308_MaC44659_TPH_IT Remediation of Operational Petrol Station in Veneto, Italy