Planning for flexibility: a case study in creating robust remediation designs that can handle the realities onsite

Webinar Highlights

  • Demonstrates the activities undertaken including:
    • Flux zone identification
    • Excavation of impacted vadose zone soils
    • Injection testing
    • In situ chemical oxidation (ISCO)
    • In situ sorption
    • Enhanced natural attenuation
  • Illustrates the challenges overcome
  • Presents the results of the treatment

In this webinar, organised by the East Land Quality Forum (ELQF), Jack Shore the District Manager for the UK and Scandinavia at REGENESIS discusses the remedial activities at a historic former timber yard. The site was impacted with high levels of petroleum hydrocarbons and a mixture of pentachlorophenol, trimethyl tin and pesticides (lindane, dieldrin and aldrin, amongst others). The timber yard had been demolished in the 1980s and an office facility was built. Due to divestment, the office parks owner wished to remediate the site before the sale. An integrated remediation strategy was devised to accelerate close out.

cover image for webinar highlights page - Planning for Flexibility: A Case Study in Creating Robust Remediation Designs That Can Handle the Realities Onsite
Planning for flexibility: a case study in creating robust remediation designs that can handle the realities onsite
Ready to get started?

Our technical experts will work with you to design tailored remediation solutions that effectively address PFAS, chlorinated solvents, and petroleum hydrocarbons—helping you achieve your site goals with confidence.