Active electronics manufacturing facility, Sweden

Case study highlights

Significant TCE soil and groundwater contamination was discovered during the refurbishment of an electronics manufacturing facility. This prompted site investigations to delineate a 450m2 source area and identified DNAPL contamination along the utility conduits and associated factory infrastructure. Treatment of these areas was required, without damaging or replacing the factory infrastructure and so an in-situ remedial approach was taken.

DNAPL and chlorinated solvent contamination treatment