REGENESIS worked with RAKE Remediation and WDE Consulting to devise a fully integrated remediation strategy in order to provide accelerated remediation of a former petrol filling station. The remedial strategy comprised:
- Targeted hot-spot excavation and a Pump and Treat (P&T) system;
- Application of ORC Advanced Pellets at the base of the excavations;
- RegenOx injections and ORC Advanced slurry injection in barriers to provide enhanced natural attenuations (ENA).