- Targeting of the residual soil and groundwater contamination by a combined ISCO and enhanced aerobic biodegradation approach resulted in > 98% reduction in BTEX, MTBE, and TBA concentrations
- MCLs reached and Site Closure granted two years after treatment
The site of a former gas station in Garden Grove, California was contaminated with BTEX, MTBE, and tertiary butyl alcohol (TBA) following the removal of eight underground storage tanks (USTs). Under the jurisdiction of the Orange County Health Care Agency and the Santa Ana Regional Water Quality Control Board, remediation of the site was undertaken with a goal of reducing the contamination to below maximum contaminant levels (MCLs).
Site remediation was first performed mechanically by an air sparging/soil vapor extraction (AS/SVE) system, which operated effectively for approximately three years, removing >25,000 lbs of total petroleum hydrocarbons (TPH). However, soil vapor rebound testing revealed that the mechanical system had reached asymptotic conditions and was no longer effective.
To accelerate the treatment of the remaining groundwater contaminants, additional remediation efforts by a combined in situ chemical oxidation (ISCO) and enhanced aerobic bioremediation approach were initiated. The ISCO treatment included a regimen of five separate direct-injection events of RegenOx® over a nine-month period to effect a bulk reduction in the total contamination. Enhanced aerobic bioremediation was then used to polish off the remaining dissolved phase contaminants via injection of ORC Advanced®.