TCE Plume Quickly Eliminated at Indiana Brownfield Site

Case study highlights

  • 100% TCE elimination in under six months – A combined remedy using PlumeStop®, 3‑D Microemulsion®, S‑MicroZVI®, and BDI Plus® reduced TCE concentrations to non‑detect across the entire site, far exceeding regulatory cleanup goals.
  • Immediate plume control with sustained treatment performance – PlumeStop permeable reactive barriers provided instant mass flux control, while S-MZVI, 3DME, and BDI Plus drove ongoing abiotic and biotic dechlorination, preventing rebound and off‑site migration.
  • Accelerated path to redevelopment and risk‑based closure – Verified complete dechlorination to non‑toxic end products supported site redevelopment under Indiana’s R2 framework and an Environmental Restrictive Covenant, helping unlock the property’s long‑term value.

At a former industrial plating site in Indiana, a complex, widespread TCE plume threatened redevelopment plans and long‑term liability. By deploying a targeted in situ remedy using REGENESIS advanced colloidal technologies, the project team achieved rapid plume control, complete contaminant removal, and long‑term treatment performance—transforming a stalled brownfield into a site positioned for safe reuse in less than six months.

Ready to get started?

Our technical experts will work with you to design tailored remediation solutions that effectively address PFAS, chlorinated solvents, and petroleum hydrocarbons—helping you achieve your site goals with confidence.