New York brownfield achieves site closure
Based on successful performance results, a pump-and-treat system was decommissioned in 2020, and the NYSDEC granted the site closure in August 2021 By not having to operate and maintain the…
Based on successful performance results, a pump-and-treat system was decommissioned in 2020, and the NYSDEC granted the site closure in August 2021 By not having to operate and maintain the…
TCE contribution to the plume was eliminated following the application. This reduction has been continuously maintained more than three years post-application. The highly controlled PlumeStop injection resulted in no surfacing…
Closure achieved for a large chlorinated solvent plume in an urban area PCE sources rapidly eliminated and plume efficiently treated using a suite of REGENESIS in situ remediation technologies Despite access limitations,…
AquiFix is the first ever micron-scale, solid electron donor to promote the effective treatment of chlorinated solvents Total CVOC concentrations in groundwater were reduced by 97% in one month and…
Innovative combined remedy on active site effectively eliminates risk to adjacent property Remedy from REGENESIS chosen based on proven effectiveness in treating similar large CVOC plumes Design Verification Testing and…
An in situ permeable reactive barrier (iPRB) was installed combining PlumeStop, S-MicroZVI and BDI Plus reagents Additional Design Verification Testing (DVT) was completed by REGENESIS prior to full-scale works Remediation…
A large-scale remediation project with challenging conditions: geology, underground services, ongoing site use and multiple stakeholders Treatment of a co-mingled chromium (VI) and TCE plume via enhanced biological dechlorination and…
High PCE concentrations were detected in soil and groundwater during a site investigation A pragmatic, phased approach was used to target PCE in soil and groundwater The multi-component treatment was…
8 million cubic feet of CVOC impacted groundwater treated 88,000 gallons of ERD remedial amendments applied in less than 13 days using novel, innovative tooling and application approach The project…
REGENESIS was asked to provide a remediation solution for a Trichloroethylene (TCE) plume in the UK. Worked closely with Golder to design and implement a novel solution that combined Plumestop, HRC and…