  • Challenges: The scale of the contamination presented a number of obstacles to success, including:
    • Treating such a widespread plume cost-effectively
    • Effectively remediating such a large contaminant mass – including DNAPL
    • Addressing re-equilibration of contamination from the soil and free-phase during treatment
    • Avoiding the accumulation of daughter compounds and ensuring their degradation.
  • Remedial Design: Combining sulfidated micron scale zero valent iron and large-volume controlled release electron donor substrates, in designs tailored to the contaminant concentrations across the source area covering 8,000m².
  • Application: 4 direct push injection rigs and a specialist injection trailer were operated concurrently to co-apply 250,000 litres of substrates into 611 injection points.
  • Results: Validation results across the target area showed an 85% reduction in TCE concentrations was achieved over a 12-month period, with full degradation occurring. This exceeded the remedial goal, allowing the site redevelopment to continue as planned.

Language: English
Presenter:  Jack Shore, Regional Manager Europe, REGENESIS and Sarah Hughes, District Manager UK & Scandinavia, REGENESIS

Integrated remediation of a high-concentration TCE plume at a former chemical works
Ready to get started?

Our technical experts will work with you to design tailored remediation solutions that effectively address PFAS, chlorinated solvents, and petroleum hydrocarbons—helping you achieve your site goals with confidence.