Remediation of an Active Petrol Filling Station in Emilia Romagna, Italy
In Situ enhanced desorption of petroleum hydrocarbonsRead More
In Situ Remediation of MTBE and BTEX at Active Petrol Filling Station
Environmental remedial treatment of MTBE with a combination of ORC-Advanced and ORC primerRead More
Environmental In Situ Remediation of a Petrol Filling Station in Italy
In Situ enhanced physical extraction of petroleum hydrocarbonsRead More
In Situ Treatment of 1,2 Dichloroethane Under a Factory, Kent, UK
A single application reduces recalcitrant contaminant below targetRead More
MBTE Remediation at an Active Petrol Filling Station in Italy
Combination of injection activities with targeted groundwater abstraction resulted in successful treatment of non-accessible source areas Read More
Bioremediation of Petroleum Hydrocarbons, Oxfordshire, UK
Summary
Following a site investigation (SI) and the removal of 8 underground storage tanks at a former petrol filling station, it became clear that the groundwater and soils beneath the site were grossly impacted by petroleum hydrocarbons (TPH). The geology comprised of made ground underlain by weathered limestone at 1m BGL. Though the groundwater concentrations were relatively low (3,000 μg/L TPH), the high sorbed mass in the soils (up to 10,000 mg/kg) was of concern. Though the remediation strategy did allow for the excavation and treatment of the weather material, due underground utilities most of the impacted material could not be excavated for health and safety reasons, without diverting the existing underground infrastructure.
REGENESIS and the Environmental Consultant formulated a remediation strategy comprising of partial excavation of impacted material (where allowed) and in-situ enhanced aerobic bioremediation of the groundwater for betterment of underlying conditions. All to be validated by groundwater monitoring to demonstrate contaminant mass reduction across the site.
Treatment
An ORC-Advanced® slurry was injected across 54 No. wells installed into the underlying bedrock with specific doses in the northern and southern areas of the site to target where TPH had been recorded during the SI. ORC-Advanced was applied across the entire plume, in order to provide enhanced aerobic biological degradation of the dissolved phase for 12 months from a single injection.
What’s Special?
- A remediation strategy where validation of the groundwater (not soil) achieved site sign-off, resulting in quick site closure.
- The in situ remediation allowed for injection adjacent to underground utilities without damaging them, avoiding the need for excavation or re-routing infrastructure.
Remediation at Active Petrol Filling Station in North Italy
Integrated treatment of petroleum hydrocarbons via enhanced physical extraction and aerobic bioremediation with PetroCleanze and ORC AdvancedRead More
In Situ Remediation of Petroleum Hydrocarbons in Deep Chalk
From LNAPL to less than 1,000 μg/L in seven months using an integrated treatment approach Read More
Petroleum Contaminated Groundwater Treatment, West London, UK
Installation of ORC-Advanced barrier successfully reduced the contaminant influx onto the site, allowing for site redevelopment without any disruption Read More
Hotspot Treatment of Petroleum Hydrocarbons – North West, UK
Phased, in situ treatment with PetroCleanze and ORC-A Socks allows main contractor to keep programme on trackRead More