ORC Advanced Application Instructions
ORC Advanced® can be applied to the subsurface in a number of different ways. The application method chosen is often determined by a range of factors including: depth to groundwater, soil type, location and extent of contaminants, remediation objectives, etc.
Typical installation of these controlled-release oxygen amendments involves mixing the ORC Advanced powder with water and forming an injectable slurry. The slurry is then injected into the subsurface using direct-push technology which can be an extremely cost-effective, efficient and clean way to deliver controlled-release oxygen into groundwater. Other common application types for ORC Advanced include: oxygen curtains (barriers), excavations, tank-pits, trenches and single or multi-well filter socks.
The following table contains ORC Advanced installation instructions for several different types of installations.
Note: All Installation Instructions are in .PDF format and can only be read using Adobe Acrobat® Reader®. Please click the icon below to download the most recent version.
Augered Hole, Back-Fill Method | Excavation Applications |
Replaceable Filter-Sock Application | Direct-Injection Slurry Application |
Geoprobe® Bore-Hole Back-Fill Method | Slurry Mixing |