Stringent regulatory targets achieved in short timescale, despite challenging site conditions

Historical industrial activities at a former silver frames manufacturing facility in Central Italy had caused chlorinated solvent contamination in the subsurface, which was extending beyond the site boundary. As the site was undergoing redevelopment into residential buildings, the construction company had a strict deadline for remediation to be completed and so a strategy was needed to avoid the long-term installation of active pumping equipment onsite.


Highlights:

  • An in situ permeable reactive barrier (iPRB) was installed combining  PlumeStop, S-MicroZVI and BDI Plus reagents
  • Additional Design Verification Testing (DVT) was completed by REGENESIS prior to full-scale works
  • Remediation targets and the client’s economic requirements were achieved on time and within budget, under a guaranteed contract

4m 44s reading time


REGENESIS has been supportive throughout all the steps, starting before our remediation design with the remedial investigation activities. Their input was crucial to identify how to best design the treatment and resulted in a very straightforward project for my client, meeting goals in a timely manner, without any surprises.” 

Alessandro Lucchesini, Technical Manager, CECAM