Environmental Remediation at Active Electronics Manufacturing Facility, Sweden
In Situ treatment of DNAPL and chlorinated solvent contamination (TCE) meant that the refurbishment of the factory could continue without interruption.Read More
Remediation of Off-Site Migrating Plume at Active Industrial Unit, Sweden
In Situ remedial treatment of chlorinated solvents with 3-D Microemulsion: Successful application both indoors and outdoors of the facility, with minimum disruption to operational activities. Read More
Remediation Beneath Residential Housing Estate in Marlow, UK
In Situ remediation of chlorinated solvents within a chalk aquifer underlying new residential properties – which had come to light after the redevelopment of a former laundry site. An example of remedial treatment in an area with restricted access.Read More
Large Scale Remediation of Former Factory in London, UK
Economically viable, large scale groundwater remediation of chlorinated solvents using 3-D Microemulstion (3DMe). Post application monitoring rounds have confirmed that over two years the concentration levels of the contaminants of concern have been maintained below site specific target levels across the 13,800 m2 site.Read More
Redevelopment of Electronics Manufacturing Facility, Midlands, UK
Enhanced anaerobic bioremediation treats chlorinated solventsRead More
Integrated Treatment Train Reduces Chlorinated Solvents and Pesticides
After a rigorous pilot trial, the data proved that 3DMe and HRC were more effective than alternative electron donors substrates.Read More
In Situ Treatment of 1,2 Dichloroethane Under a Factory, Kent, UK
A single application reduces recalcitrant contaminant below targetRead More
In Situ Bioremediation of a PCE Plume in Antwerp, Belgium
One week’s site work provides five years of remedial treatment, with no impact on ongoing commercial operationsRead More
Plume Remediation at an Active Manufacturing Site near Orléans, France
The remedial works were completed in difficult working conditions; in a busy delivery yard, without disruption to existing site activities.Read More
Chlorinated Solvents Treatment at Former Dry Cleaner Site, UK
Excavation treatment and direct push application of HRC and HRC Primer, providing a reactive barrier at the down gradient site perimeter.Read More